Laynie Hasan.

← News & Current Events

Africa, Environment & Colonial Accountability

Algeria begins second cleanup at French nuclear-test site

Algeria says a nationally led operation has begun identifying radioactive areas and collecting waste at the Béryl E2 tunnel in In Ekker. The government has not published independent measurements, a completion timetable or a French response.

Published
Updated
Event: Operation announced and begun November 1, 2026

The operation targets radioactive waste at the Béryl E2 tunnel

Algeria’s Defence Ministry said a second cleanup operation began November 1 at the Béryl E2 nuclear-test tunnel in the In Ekker area of Tamanrasset. The ministry said Algerian teams are working with the national agency responsible for rehabilitating former French nuclear-test and explosion sites. The announcement establishes that the government launched the operation; it does not independently measure the remaining contamination or prove that the site has been made safe. [1][2][3]

The stated work includes locating radioactive zones, collecting nuclear waste and placing it in purpose-built concrete containers under national and international safety protocols. No reviewed source disclosed the volume or isotope profile of the waste, worker exposure data, the disposal facility, a completion date or results from independent environmental sampling. [1][2]

The dispute includes records and responsibility for colonial-era contamination

France conducted nuclear tests in the Algerian Sahara beginning in 1960. Algeria’s ministry accused France of withholding records and maps showing where radioactive waste was buried and said contamination remains an obstacle to development around In Ekker and Reggane. That is the Algerian government’s stated position; the reviewed reports did not include a new response from the French government. [1][2][3]

The ministry described the November work as the second operation, following a partial cleanup at Taourirt Tan Afella in February. Calling it a cleanup milestone should not be read as a completed remedy for affected communities, a final health assessment or a legal finding assigning compensation. [2][1]

Residents and workers need transparent measurements and long-term follow-up

The consequential next evidence is site-specific radiation data before and after removal, worker-protection records, a verified waste inventory, groundwater and soil monitoring, public-health follow-up and disclosure of burial maps. Without those records, the scope and effectiveness of the operation remain uncertain even though the launch itself is documented. [1][3]

How the sources compare

SourceWhat it addsScope or limitation
Algeria Press Service and Defence Ministry statement · ArabicThe site, responsible agencies, announced method and government position on missing records.A government statement is not an independent radiological audit and gives no measured contamination or completion result.
Al Jazeera Arabic · Arabic regional reportingExplains the cleanup sequence, container method and earlier February operation.The core operational facts derive from the Algerian ministry.
Anadolu · French reportingProvides a separate regional-language account and the records dispute.It also relies heavily on the ministry statement and carries no new French response.

What remains unclear

The measured contamination levels, waste volume, isotopes and geographic extent before cleanup.

The operation’s timetable, final disposal arrangements and independently verified results.

Worker and community exposure data and the design of continuing health surveillance.

Whether France supplies burial maps, technical archives, remediation support or compensation.

Sources & translations

  1. Algeria Press Service — انطلاق العملية الثانية لتطهير موقع نفق التجارب بيريل بتمنراست من النفايات المشعةNovember 1, 2026; 12:32 p.m. local time · Arabic; summarized in English · State wire carrying the primary Defence Ministry statementThe site name, responsible agencies, cleanup steps and allegations about withheld maps were checked in Arabic.
  2. Al Jazeera Arabic — الدفاع الجزائرية تبدأ ثاني عملية تطهير لمواقع تجارب نووية فرنسيةNovember 2, 2026 · Arabic; summarized in English · Regional Arabic-language reportingThe operational sequence, concrete-container method and historical date were checked in Arabic.
  3. Anadolu Agency Français — L’Algérie lance la 2e opération de nettoyage des déchets nucléaires français sur le site de Béryl à In EkkerNovember 1, 2026 · French; summarized in English · Independent regional reportingThe site, ministry announcement and French-records allegation were checked in French against the Arabic accounts.

Updates & corrections

  • — Initial report documents the announced cleanup while separating the operation’s launch from unverified remediation results, health findings or legal responsibility.